Carriage House after the move

November, 2008







The house was placed on a series of hydraulic jacks, and on stacked blocks, as you can see.






Wide flange steel beams were used as support.









Controlling/motor for the jack system.















The house is dropped in 18" increments. It is jacked up, blocks are removed as required,
then the house is lowered. This is done in steps, as needed.
The Structural Moving company has a lot of experience doing this kind of work.









I just loved this picture. The old and the new, side by side!






~~~